Project Brif:The client decide to make convert a residential building into a 10th floors hospital with total built up area of 4000 SQM
Diar scope of work:
- Architecture Design Package as per Construction requirements
- MEP Design Package.
- Preparation of drawings and documents required for the extraction of construction license.