Project Brif:Petrogulf misr is intending to conduct HSE CASE study for Geisum Star (central offshore processing facilities)
Diar scope of Work:
- Consultation during documents collection and arranging for final issue of HSE case documents.
- HAZOP Study for CPS
- SIL for CPS facilities
- DIAR team will start to simulate and study proposed alternatives for new rental flare location based on the following:
- Hydraulic calculations regarding the pipelines between the two platforms,
- Flare system utilities matching with each case and radiation & dispersion study output,
- Available space on WP-C and WP-D platforms and Existing pipeline condition for each platform.