MESAIEED Industrial Area

An industrial area in Al Wakrah Municipality in the State of Qatar, approximately 40 kilometers south of Doha. MESAIEED was established in 1949 as a tanker terminal by QatarEnergy on a previously uninhabited site along the coast. The first industrial facilities prepared on site were oil pumps and oil storage tanks. Further development by the government was undertaken on MESAIEED from 90’s to present. They installed industrial facilities, mechanical equipment and developed the road system at an estimated cost of $200 mn.

Project Overview:

Diar successfully completed a challenging project aimed at improving the operation, maintenance, environmental standards, and safety aspects of Qatar Energy NGL Plants. The primary objective of this
project was to enhance the monitoring and efficiency of the drain piping system for 15 crude oil storage tanks located in the Tank Farm area in MESAIEED.

Project Phases :

Phase(1): Design/Engineering Phase:
initial stage of the project, focusing on identifying and recommending detailed designs for the modification of the drain piping system in the 15 crude oil storage tanks.

Phase(2): Construction Phase:
The execution of the procurement, supply, installation, construction, demolition, testing, inspection, tie-in, commissioning, start-up,

Diar Scope of Work:

• Study of Tanks Drain line Piping: 
Diar conducted a comprehensive study to examine the underground and above-ground drain systems installed in the 15 crude oil storage tanks. Covering important aspects such as piping placement, routing, sizing, material selection, and necessary modifications to optimize the piping monitoring process.

• Interface with Existing Systems and Facilities:
Diar ensured a success interface between the proposed modifications and the existing systems and facilities. With Coordination with Process, Mechanical/Piping, Instrumentation/Control, Electrical, Civil/Structure, and Loss Prevention/Safety departments.

Key Deliverables:

• Site Survey Report
• Detailed Engineering Study Recommendation Report
• Updated As-Built Drawings
• Design Package 
• Final EPIC Package